FAIL (the browser should render some flash content, not this).  
title - Case Summaries
horizontal line

Municipal Services image

horizontal line
Broughton WwTW
 - Kettering, Northamptonshire

Situated approximately four miles west of Kettering off the A43 trunk road to Northampton , Broughton wastewater treatment works required extensive improvements to meet the demands of projected local infrastructure growth from the villages of Broughton and nearby Cransley with new flows to be received from Mawsley. In addition, the works are to meet revised consent limits to final effluent quality complying with River Needs Consent (RNC) requirements and storm overflow discharges to Asset Management Plan (AMP).

Population

4260

PE

DWF
963
m3 /d
Formula A Flow
6760
m3/d
Flows to full treatment (FFT)
78.6
l/s

horizontal line
Next News Item
Broughton Waste Water Treatment Works Broughton Discharge Broughton 3D Visualisation Broughton Under Construction
icon pdf NB. Requires Adobe PDF Viewer -
click here to download it for free

horizontal green line
About bullet icon Case Summaries bullet icon Products bullet icon News bullet icon Contact bullet icon Enquiry
horizontal green line
Designed by Stad Design Consultancy