FAIL (the browser should render some flash content, not this).  
title - Case Summaries
horizontal line

Trade Effluent image

horizontal line
G’s Salads WwTW - Vegetable Preparation Plant
 - Ely, Cambridgeshire

 

Plant Load:

48.3 kg BOD/d
Design Flow 94 m3/d

Population Equivalent:

800 PE to organic load

Final Effluent Consent:

10 mg/l BOD (ATU)
15 mg/l TSS
2 mg/l NH3-N
95 %ILE

Preliminary Treatment:

Screening

horizontal line
Previous News Item Next News Item
G Salads
icon pdf NB. Requires Adobe PDF Viewer -
click here to download it for free

horizontal green line
About bullet icon Case Summaries bullet icon Products bullet icon News bullet icon Contact bullet icon Enquiry
horizontal green line
Designed by Stad Design Consultancy